Paving progress

 Since Monday  the year 12's and I have been planning out our new paving path we  are going to build outside the hall. The reason we want to build a new pavement foot path is because the students tend to track mud into their classes, so we want to eliminate the problem and build our pavement path for the solution.  What we did first is we had a long look at where we want our path, how long we want it and how wide. We calculated the width and length of the path. The width of it is 1.5 metres and the length is 3.50 metres. We also decide that instead of a straight path we want it to go out wider. 

For example:

Prototype 1 


Straight path

(what we are not doing)





Prototype 2 


Wider foot path